July 21- Leveling of sunroom floor, Sibel tile, electric work












The sunroom was pretty sloped, after tile removal they are trying to level it with concrete.
Sibels bathroom tiles are up.
Electric work is halfway done, prep for recessed lightings and a lot of other wiring is underway.
Posted by Aylin at 6:38 AM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ►  2009 (1)
    • ►  December (1)
  • ▼  2008 (15)
    • ►  October (1)
    • ►  August (3)
    • ▼  July (11)
      • July 30 - things are starting to look better
      • July 23rd Bath,shower wall tiling completed, ceili...
      • July 21- Leveling of sunroom floor, Sibel tile, el...
      • July 19- the step is out, tiles are finally cleared !
      • July 18- Finishing up terra cotta removal - surpri...
      • July 17th, tiles are going on bathtub is in .. ! s...
      • July 15, knockdown ceiling prep of Elif Bathroom
      • July 14th - knockdown ceiling install bathroom window
      • July 11th - Covering up for popcorn ceiling removal
      • July 2nd Closing
      • First glimpse ! How things were

About Me

My photo
Aylin
View my complete profile