July 21- Leveling of sunroom floor, Sibel tile, electric work
The sunroom was pretty sloped, after tile removal they are trying to level it with concrete. Sibels bathroom tiles are up. Electric work is halfway done, prep for recessed lightings and a lot of other wiring is underway.
No comments:
Post a Comment