Thursday, July 24, 2008

July 23rd Bath,shower wall tiling completed, ceilings painted,walls primed, master bedroom leveled













Seems like we are over the hump. Bath,shower wall tiling completed( little bathroom floor tiles need to go in), ceilings painted,walls primed, master bedroom leveled.
The pile in the middle of the tv/living room is our kitchen.

The house is starting to show signs of a new beginning !

Tuesday, July 22, 2008

July 21- Leveling of sunroom floor, Sibel tile, electric work












The sunroom was pretty sloped, after tile removal they are trying to level it with concrete.
Sibels bathroom tiles are up.
Electric work is halfway done, prep for recessed lightings and a lot of other wiring is underway.

Sunday, July 20, 2008

July 19- the step is out, tiles are finally cleared !





Finally the terra cotta is off, and we gained about 35 square feet into that living area by taking out the step. Yeah !

Friday, July 18, 2008

July 18- Finishing up terra cotta removal - surprise !







To remove the terra cotta tile from the sunroom a road construction machine was used and I was told that it even broke its blade ! Instead of tile adhesive they were stuck there with cement urghh.
We had a nice surprise though, one part of the pointless step that was in the middle of the sunroom turned out to be made from wood ! So we are taking that down that will add more space, and voila the terra cotta is continuing under there too.

Thursday, July 17, 2008

July 17th, tiles are going on bathtub is in .. ! some more demolition




Elif's bathroom tiles are starting to go in, and the living room tiles, Sibel's bathroom floor tiles are being taken out !

Wednesday, July 16, 2008

July 15, knockdown ceiling prep of Elif Bathroom




Mostly prep and cleaning up of walls, finishing the popcorn ceiling removal from the garage.
Preparing Elif's bathroom for the bathtub installation. Finising the glass tile window intall.
Opening a window to Elif's room from the bathroom ( temporary of course)